Latest project

Kent AirValve Chamber

Urgent reactive repair to a burst rising main within an enclosed chamber at Manston, Kent

GLE was called to site as part of a P1 reactive response to a burst rising main within a chamber in Kent. A large DN800 T-section was severely corroded and required urgent repair. GLE’s team mobilised immediately to stabilise the failure, ensuring continuity of service and safe containment of the system.

View case study

Shepherds Bush Market – Railway Arch Redevelopment

Design and build of a new DDA Compliant public toilet to an existing railway arch at Shepherds Bush Market

View case study

FEPs and SAS Access Fabrications

Designed, fabricated and installated access steelwork at a live pumping station.

View case study

Paddington Bridgework

EXC3 Steework, bolting and site welding to strengthen a bridge at Paddington Station

View case study

LRPS Above Ground Pipework

Installation of approx 150m of DI Pipework

View case study

Silvertown Flood Gate Refurbishment

Silvertown Flood Gate Refurbishment

View case study

Laddingford Fencing, Gates & Resurfacing

Fencing, Gates & Resurfacing

View case study

Start a project today

Get in touch and let us know your project’s requirements

Contact us